Skip to main content

CE opens social media accounts

Chief Executive John Lee launched a Facebook page, an Instagram account and a Weibo account today to enhance contact and communication with the public.   People are welcome to visit his social media page and accounts. http://dlvr.it/ST8zqb

101 HIV cases reported

A total of 101 additional cases of HIV infection were reported in the first quarter of the year, the Centre for Health Protection announced today.   Of the new cases, 87 were males and 14 were females, bringing the total number of reported HIV infections to 10,886 since 1984.   Fifty people acquired the virus through homosexual or bisexual contact, while 22 cases acquired the infection by heterosexual contact.   The routes of transmission for 29 cases have yet to be determined.   The centre said sex remains the major mode of HIV transmission and people should use condoms consistently and properly to reduce the risk of acquiring HIV.   There were 24 new cases of AIDS reported in the quarter, bringing the total number of confirmed cases to 2,254 since 1985.
http://dlvr.it/S0M6bp

Popular posts from this blog

Download Ricepon App on iPhone and Android

I found a very good dining app in Hong Kong. You can use QR Code to order food in restaurant, order takeaway at home and enjoy coupon. iPhone Download : https://tinyurl.com/wywn5lc Android Download : https://tinyurl.com/tnvlug8 Ricepon App Official Website : http://www.gingersoft.com.hk/ricepon-app/

Railway settlement exceeds limit

The construction works of a relocation project in Kowloon have been suspended after a settlement monitoring checkpoint exceeded the limit, the Government said today.   The project relocates supporting operational facilities of Tsim Sha Tsui Fire Station Complex, Fire Services Club and other fire services accommodations to To Wah Road in Kowloon.   The Government explained that the readings recorded in a settlement monitoring checkpoint installed inside the railway tunnel between Kowloon Station and Olympic Station of the MTR Tung Chung Line had reached 20.27mm on September 7. The preset trigger level for works suspension is 20mm.   For the sake of prudence, the Mass Transit Railway Corporation suspended relevant works within the railway protection area on the same day.   The Buildings Department and the Architectural Services Department deployed staff to inspect the affected railway tunnel and confirmed that it is structurally safe.   The Electrical & Mechanical Services